Publish Time: 2022-07-22 Origin: Site
maintenance
1. The working environment should be kept clean to prevent dust from falling into the gluing system and affecting the quality of gluing.
2. The lubricating oil in the reducer should be replaced with new lubricating oil after the first use for one month, and it should be replaced every six months thereafter. If the workload is heavy, it should be replaced once every three months. When the temperature is high in summer, the lubricating oil of the reducer with high viscosity should be replaced. When the temperature is low in winter, the lubricating oil of the reducer with low viscosity should be replaced. Transmission system: For sprocket transmission, add butter once a month to the chain part. In the case of a gear transmission system, grease should be added to the turbine seat once every two weeks, and grease should be added twice a week if the turbine seat has no oil seal.
3. After the work is completed, the main power supply must be turned off.
4. When repairing or adjusting the parts, it should be handled by related professionals.