Views: 8858 Author: Site Editor Publish Time: 2022-05-31 Origin: Site
When using it for the first time, open the lid of the glue pot and add an appropriate amount of hot melt glue to the glue pot to confirm the type of hot melt glue.
After confirming that the motor switch is in the off position, connect the power supply and press the power switch to adjust the sol temperature of the temperature controller to preheat the edge banding machine.
Pre-heat for 5-10 minutes. After confirming that the hot melt adhesive is completely melted, turn on the motor switch, adjust the knob, and adjust to high speed for gluing. At this time, tighten the glue gauge to make the glue quantity small.
After the double-gluing rubber rollers are fully glued and the glue quantity is even, adjust the glue gauge to the proper glue output, adjust the speed control knob to slow down the motor speed to reach the edge banding speed.
Before edge banding, adjust the front, middle and back three pressure belt devices to the appropriate position according to the width and thickness of the edge band.
Copyright © Guangzhou Tiege Woodworking Machinery Co., Ltd. All Rights Reserved.| Sitemap